Terms of Reference, Bid Documents and Requirements to be Completed by Bidders/Contractors for the Completion of the Official Residence of the Consul General of the Republic of the Philippines
12 April 2005

Consulate General of the Philippines, Hong Kong SAR

Bids and Awards Committee for the Completion of the Renovation Works in the Official Residence of the Consul General, 29/F Villa Veneto, Kotewall Road, Mid-Levels, HK

 Terms of Reference, Bid Documents and  Requirements to be Completed by Bidders/Contractors for the Completion of the Official Residence of the Consul General of the Republic of the Philippines

1.0             Description of the Project

The public bidding of the remaining works and fit-out services for the completion of the official residence of the Consul General in Hong Kong SAR, China is being undertaken pursuant to instructions from the Department of Foreign Affairs, Manila, for the Consulate General to ensure the completion and turn-over of the project to the Philippine Government within a specified period of time. 

The project site is a three-bedroom flat with a maid’s quarter/storage room,2 bathrooms (one en suite in the Master bedroom), living and dining area, kitchen, pantry, laundry area, and ante room measuring 2,562 sq. feet. It is located on the 29/F of Villa Veneto, Kotewall Road, Mid-Levels District, Hong Kong. 

The property was first purchased by the Philippine Government in 1982 and is wholly-owned by the Government of the Republic of the Philippines for use as the official residence of the Consul General.

The works which remain to be completed based on the renovation undertaken by a previous contractor include refurbishing of the various rooms and spaces in the property, provisions of fixtures, provision of built-in furnishings wherever applicable, and ensuring the operationability of the electrical, sprinkler/fire protection systems, and other works including the air-conditioning system. 

2.0             Approved Budget for the Completion of the Renovation Project

Pursuant to the instructions and approval granted by the Department of Foreign Affairs, Manila, the approved budget for the completion of the project is HK Dollars  HK$ 687,545.84.

3.0             Delivery Time and Completion Schedule for the Renovation Project

Pursuant to the instructions of the Department of Foreign Affairs, the target date for the completion of the renovation works at the official residence  and the turn-over of the project to the Consulate General of the Philippines is 31 May 2005.

4.0             Scope of Work

4.1       Design Requirements- In view of time and budgetary requirements, interested contractors are not required to submit full-blown designs of the renovation and fit-out works of the official residence of the Consul General but will adhere to the original design prepared by the original contractor with allowance for only minimal/minor design variations due to necessities or exigencies in the construction process; to enhance the existing design/works; and in cases where no design was submitted for a particular area of the property subject of the works.  The design drawing and other specifications along with related floor and technical plans of the property are attached hereto as Annex A.

4.2       Works for Correction and Completion – A Summary of Works prepared by the Properties Committee of the Department of Foreign Affairs specifying the areas of construction, refurbishing and fit-out works at the property is hereto attached as Annex B as the reference point for the work to completed by the selected contractor.

5.0             Bid Security

All interested contractors are required to submit along with their bid documents a form of Bid Security in either cash, certified check, cashier’s check, bank draft or irrevocable letter of credit (LOC) in the amount of HK Dollars HK$ 6,875.45 representing one per cent (1%) of the approved budget for the project to be bid

The Bid Security must be valid for at least sixty (60) days from the date of submission to the Bids and Awards Committee (BAC) of the Philippine Consulate.

The Bid Securities will be returned after the selected bidder has signed the contract for the completion of the renovation project but in no case later than the expiration of the Bid Security validity period.

6.0             Eligibility Requirements

All interested contractors are required to submit the following with their other bid documents:

·    Audited Financial Statements for the last three financial years

·    A list of current and past projects of a similar nature in the last three(3) years to include the name, type, size of the project, total contract value at award, duration of contraction and year of completion (wherever applicable), contact details and name/s of the contact person from the client organization. Use attached prescribed form attached hereto as Annex C

·    Details of the sub-contractors the firm plans/intends to use for the prospective project. Use the prescribed form attached hereto as Annex D.

·    Copy of Business Registration in Hong Kong

·    Address of office/s, list of officers contact numbers, and indicate if sole proprietorship, company, partnership or joint venture

·    Technical Proposals for the Construction including the proposed work schedule, materials board/samples, refurbishing/renovation works methods/process, drawing or illustrations of minimal design variations whenever called for in the construction process; to enhance the existing design/works; and in cases where no design was submitted for a specific area of the property subject of the work.

·    Financial Proposal

·    A Statement under oath by the prospective bidder or its duly-authorized representative that each of the documents submitted in satisfaction of the eligibility requirements is an authentic and original copy, or a true and faithful reproduction or copy of the original, is complete, and that all statements and information provided therein are true and correct.

·    Affidavit of Site Inspection a form for which is attached thereto as Annex E. The said affidavit may be sworn to either before a Notary Public duly-registered in Hong Kong SAR or by an official of the Philippine Consulate General in HK authorized to administer oaths.

7.0             Instructions to Bidders

7.1       Site Inspection – A site inspection of the property at 29/F Villa Veneto, Kotewall Road, Mid-Levels, Hong Kong, will be conducted at the same time for all interested contractors.  The schedule for the site inspection is 0930 H, 13 April 2005, Wednesday.  Representatives of all interested contractors will be required to be at the site by 0930. No separate or individual visits of contractors will be scheduled. Representatives of interested contractors will be allowed to take photographs of the work site provided any and all photos taken will be utilized solely for purposes of aiding contractors in the preparation of their proposals.

7.2       All bidders are required to submit their final bid documents on or before 1800 H, 20 April 2005, Wednesday, to the BAC Secretariat, Philippine Consulate General, HK (Attention: Ms. Rowena M. Neri).

7.3       The bids shall be contained in two (2) separate sealed envelopes addressed to:

Ma. Theresa B. Dizon-de Vega

Chair, BAC

Consulate General of the Philippines, HK SAR

14/F United Centre, Admiralty, HK

 

7.4       The first sealed envelope to be labeled “Technical Proposal” will include the following documents:

a.   Bid Security

b.   Construction Schedule

c.   Manpower Schedule

d.   Organizational Chart for the Project

e.   List of Contractors with details (personnel, brief company profile, proof of registration in HK)

f.    Affidavit of Site Inspection

g.   Audited Financial Statement for the last three (3) years

h.   A list of current and past projects of a similar nature in the last three(3) years to include the name, type, size of the project, total contract value at award, duration of contraction and year of completion (wherever applicable), contact details and name/s of the contact person from the client organization

i.    Technical Proposals for the Construction including the proposed work schedule, materials board/samples, refurbishing/renovation works methods/process, drawing or illustrations of minimal design variations whenever called for in the construction process; to enhance the existing design/works; and in cases where no design was submitted for a specific area of the property subject of the work.

j.    Copy of Business Registration in Hong Kong

k.   Address of office/s, list of officers contact numbers, and indicate if sole proprietorship, company, partnership or joint venture

7.5       The second sealed envelope to be labeled “Financial Proposal) should contain the following documents:

a.   Schedule of Works and Costs with detailed estimates of all expenses to be incurred by the contractor for the completion of the project including indicating unit prices of all construction materials, fixtures, labor rates, equipment, wirings, airconditioning system, and equipment rentals (whenever applicable) and all applicable taxes/levies/fees/duties.

8.0             Performance Security

The selected contractor will be required to post a Performance Security upon signing of the contract.  The Performance Security may be in any of the following forms:

8.1       cash, certified check, cashier’s/manager/s check, bank draft/guarantee confirmed by a reputable bank

8.2       irrevocable letter of credit issued by a reputable commercial bank or in the case of an irrevocable letter of credit issued by a foreign bank, the same shall be confirmed or authenticated by a reputable local bank

8.3       surety bond callable upon demand issued by any reputable surety or insurance company

8.4       a combination of the foregoing

The required amount of security shall be five percent (5%) of the total contract price.

9.0             Evaluation of Bids

The BAC will evaluate the bids/proposals submitted by the aforementioned deadline in accordance with prescribed procedures under existing regulations for the procurement of infrastructure services. The selected bidder will be subjected to post-qualification and if determined to be post-qualified will be awarded the contract for the project.

10.0         Any questions or clarifications regarding the requirements should be addressed to the BAC Secretariat for the Completion of the Renovation Work of the official residence (Attention: Ms. Rowena M. Neri), Consulate General of the Philippines. However, once the bids have been submitted for evaluation, bidders may not inquire from any BAC member or BAC Secretariat member on the status of their respective bids until the issuance of a Notice of Award to the selected contractor.

 

For the reference and information of all interested contractors/bidders.

11 April 2005, Hong Kong SAR PCG


 

 

 

 

 

 